Tumacacori — Monument to Christendom

Share:
This magazine excerpt highlights the history of the Tumacacori National Monument and details the cultural ceremonies and rodeos of the Yaqui and Papago Indians near Tucson. It also documents the official proceedings, contract awards, and administrative decisions from the October 1937 meetings of the Arizona State Highway Commission. Finally, the text provides a comprehensive update on active road construction and maintenance projects across the state's highway districts.

Featured in the December 1937 Issue of Arizona Highways

BY: Joseph Miller

Tumacacori-- "MONUMENT TO CHRISTENDOM"

By JOSEPH MILLER
(Illustrations by Author)

THE RUINS of old Tumacacori stand today as mute evidence of a resolute struggle toward Christendom—a memorial to courageous padres whose efforts in converting the peaceful Indians, despite repulsions by marauding hostiles, were unprecedented.

The mission twice destroyed, twice restored, was abandoned after a third raid and conflagration; the padres and many of their followers, journeying northward, sought more peaceful environs.

San Jose de Tumacacori was one of a chain of missions extending from the Republic of Mexico. Five were in Arizona, the northernmost being San Xavier del Bac, finest and most beautiful of all missions. San Xavier is still being used. Except for it, Tumacacori alone remains. The others are masses of ruins, almost obliterated.

The priests' residences, that once stood adjacent to Tumacacori, are gone. Gone, too, are the peons' houses, that fronted on the mission. The old mud-brick wall enclosing the cemetery plot and mortuary chamber, to the rear, is intact, and still one of the best enclosures in Arizona.

Here and there, within this enclosure, are little mounds of rocks, marking different graves, many of them victims of Indian raids upon the mission. Some have crude wooden crosses at the head. One of the graves is known to be very old, while some are comparatively recent. These grounds are still considered sacred by the local population, and several burials have been made there the last few generations.

In the early days the Indians would plunder the graves known to belong to those of another race, it is said. Therefore, the Mexican people and others would scrawl an inscription on the inner walls of the enclosure and leave the graves unidentified.

The Arizona State Highway Commission met in regular session in their offices in the Highway Building at 10:00 A. M., October 20, 1937. Those present were: Vice-Chairman Angle, Commissioners Langmade, Scott and Seale, also the Secretary and Assistant Attorney General Lynch. Commissioner Angle presided in the absence of Chairman Dowell, and H. C. Hatcher acted in the absence of the State Engineer.

Arizona Highway Commission Notes

OCTOBER 20, 1937

Upon the recommendation of Mr. Hatcher, who presented a letter of prior concurrence from the Bureau of Public Roads, it was moved by Commissioner Seale, seconded by Commissioner Scott, and carried, that the contract on the Cottonwood-Sedona Highway, F. A. (1938) A. F. E. 7929, be awarded to the low bidder, W. E. Orr, Contractor, in the amount of $102,089.58, subject to the rules and regulations of the Bureau of Public Roads.

Upon the reading of a letter of recommendation from District Engineer W. R. Hutchins, it was moved by Commissioner Seale, seconded by Commissioner Langmade, and unanimously carried, that the contract be awarded on the Tucson Streets, WPA 80-4-7, to the low bidder, White and Miller, on Alternate No. 1, in the amount of $8,463.00.

Upon the reading of a letter of recommendation from the Building Engineer, R. A. Hoffman, it was moved by Commissioner Langmade, seconded by Commissioner Seale, and unanimously carried, that the contract for an addition to the General Office Building—A.F.E. 330-2, be awarded to the low bidder, H. R. Meadows, in the amount of $30, 654.00.

On the recommendation of the Purchasing Agent, M. C. Pratt, it was moved by Commissioner Scott, seconded by Commissioner Seale, and unanimously carried, that the bid on 65,476 feet of lumber to be used for a WPA Project for widening of bridges between Picacho and Casa Grande be awarded to the low bidder, the O'Malley Lumber Company, in the amount of $2,604.63.

It was regularly moved by Commissioner Langmade, seconded by Commissioner Seale, and unanimously carried, that the application of the Cortaro Farms Company for a permit to cross the Casa Grande Highway in the vicinity of Marana with a spur track be granted, subject to the conditions laid down by the Engineering Division, and subject to the carrying out of rules and regulations of the Arizona Corporation Commission.

AFTERNOON SESSION

The Commission reconvened at 1:40 P. M., October 20, 1937, all members present except Commissioner Dowell.

Mr. L. K. Doutrick, of the Central Arizona Light and Power Company appeared before the Commission concerning the granting of an application for permit to place a four-inch gas main on Van Buren Street from the end of the existing gas main, located east of twenty-fourth street, to Delano Street. After some discussion, it was regularly moved by Commissioner Langmade, seconded by Commissioner Seale, and unanimously carried, that the permit be granted subject to the conditions that may be made by the Engineering Divison in case the road is widened or abandoned and subject to such conditions, as may be made by the Landscape Engineer, F. M. Guirey.

Mr. Albert Stevens of Glendale requested a temporary or permanent permit to lay a three-quarter inch pipe on the northeast side of Hadsell Avenue in the Hadsell Addition, Glendale, for a distance of approximately 150 feet for the purpose of carrying water to his stock. It was regularly moved by Commissioner Langmade, seconded by Commissioner Seale, and unanimously carried, that a temporary permit to expire May 1, 1938, be granted Mr. Stevens; the pipe line permit laid under the supervision of the Engineering Division.

It was regularly moved by Commissioner Langmade, seconded by Commissioner Seale, and unanimously carried, that resolution pertaining to the establishment, location and relocation and specific designation of the Benson-Steins Pass Highway, Project No. 130, Section A, be adopted.

It was regularly moved by Commissioner Langmade, seconded by Commissioner Seale, and carried, that the Commission adjourn at 4:40 P. M., October 20, 1937, to reconvene again at 10:00 A. M., Tuesday, October 26, 1937.

It was moved by Commissioner Scott, seconded by Commissioner Seale, and carried, Commissioner Dowell not voting, stating he was not very familiar with the facts in the case, that the recommendation of the Locating Engineer with references to the change of alignment of the highway through Cactus Gardens be accepted.

It was moved by Commissioner Seale, seconded by Commissioner Scott, and carried, Commissioner Dowell not voting, that a resolution pertaining to the establishment, location and relocation and specific designation of F. A. P. No. 59, Phoenix-Prescott Highway, be adopted.

The Commission reconvened at 2:15 P. M., October 26, 1937, all members present, and H. C. Hatcher acting in the absence of State Engineer O'Connell.

Awarding of bids received for sale of Obsolete Equipment October 26, 1937, at 10:00 A. M.

On the recommendation of the Superintendent of Equipment, A. B. Campbell, it was moved by Commissioner Angle, seconded by Commissioner Seale, and unanimously carried, that the bids on Lot Numbers 1 and 2 be awarded to the high bidder, Effron and Company, Phoenix. On Lot 1 at the price of $4.75 per ton and Lot 2 at $36, providing, all material in Lot Number 1 and 2 is moved away in accordance with the specifications.

On the recommendation of the Superintendent of Equipment, it was moved by Commissioner Angle, seconded by Commissioner Seale, and unanimously carried, that the high bid of J. Paul Mossau of Phoenix, on Lot 4, in the amount of $10 be accepted, providing, the material is moved away, according to the specifications.

At the request of the Commission, Mr. Hatcher advised A. E. Parmer, who with his Department Head had been requested to come before the Commission, that since it had come to the Commission's attention tickets for a proposed dance are being sold in wholesale lots to different business people doing business with the Highway Department, many of whom have protested the sale of tickets in this way, the Commission had gone on record that this cease at once; also, that tickets shall not be sold during office hours, nor shall highway equipment be used for their distribution.

A written request from Arno B. Cammerer, Director of Tourist Bureau, National Park Service, Department of the Interior, that the Department prepare an address covering the outstanding historical and scenic attraction of the State for representation over an international hook-up during a series of 15-minute radio broadcasts, which will extend over a period of a year in weekly broadcasts, was presented. It was regularly moved by Commissioner Seale, seconded by Commissioner Angle, and unanimously carried, that the Secretary with the assistance of any officials needed, secure and compile the data necessary for such a broadcast.

Mr. Hatcher presented a letter from Charles Upham, Secretary of the American Road Builders Association, requesting the Department to furnish competent speakers to make addresses prepared by the Association at certain times over certain broadcasting stations in the State, the first address being scheduled for November 5th from Jerome. It was moved, seconded and carried, that the request be granted and that Commissioner Seale be assigned as the first speaker.

It was moved by Commissioner Angle, seconded by Commissioner Langmade, and unanimously carried, that the application from A. B. McGlamery, of Tucson, for permit to place a water line on the right of way of the Tucson-Benson Highway, U. S. 89, extending from the City Main, along the south side of 80 a distance sufficient to reach his property, which is about 1150 feet be granted, and that the same type of agreement be entered into with Mr. McGlamery as that entered into with the City of Phoenix granting them a similar permit west of Phoenix on Highway 80.

Commissioner Scott gave an interesting report on the annual meeting of the American Association of State Highway Officials, which he attended in Boston September 27, 28, 29 and 30th. Particular note was made of the group assemblies he atLee Moor Contracting Company has contract 50% complete on 9.5 miles of roadway beginning about 5 miles northwest of Kingman and extending northwesterly. Kingman-Boulder Dam Highway, F. A. 123-B (1937). C. S. Benson, resident engineer.

OLD PUEBLO . . . Road Projects Under Construction

DISTRICT NO. 1
G. B. Shaffer, District Engineer

Fisher Contracting Company has contract 72% complete on 3.25 miles of roadway near Sedona. Prescott-Flagstaff Highway, F. A. 96-E (1937). J. A. Quigley, resident engineer.

Pearson-Dickerson have contract 20% complete for the grading, draining, aggregate base course and asphalt treatment of approximately 2.9 miles of the Kingman-Boulder Dam Highway, F. A. 123-C. C. S. Benson, resident engineer.

Tanner Construction Co. has contract 20% complete for the construction of concrete curb and gutter, concrete pipe and select material and cut back mix in the town of Wickenburg, Phoenix-Prescott Highway, F. A. 84-C Reo. Joe DeArozena, resident engineer.

W. E. Orr has been awarded a contract for the grading, draining, concrete base course, asphaltic surface treatment on approximately 5.7 miles of the Cottonwood-Sedona Highway, F. A. 96-F. J. A. Quigley, resident engineer.

DISTRICT NO. 2
F. N. Grant, District Engineer

The Arizona Sand & Rock Company has contract 85% complete on Flagstaff-Fredonia Highway, F. A. 95-A, 1st Reo (1937). Sam C. Redd, resident engineer.

Geo. W. Orr has contract 97% complete on about 5.5 miles of roadway near Concho on the Holbrook-St. Johns Highway. F. A. 6-B, 1st Reo (1937). H. B. Wright, resident engineer.

Pearson-Dickerson have contract 85% complete for the grading, furnishing and placing of select material, aggregate base course and oil processing of approximately 8.8 miles on the Flagstaff-Fredonia Highway, F. A. 95-G. J. B. Robinson, resident engineer.

The Tiffany Construction Co. has contract 84% complete for asphalt surface treatment on approximately 15½ miles of the Flagstaff-Fredonia Highway, F. L. H. Project 4-B. J. L. Bone, resident engineer.

The Tanner Construction Co. has contract 62% complete for the grading and draining of approximately 2-4 miles of the Showlow-Concho Highway, F. A. 104-B. H. B. Wright, resident engineer.

DISTRICT NO. 3
R. C. Perkins, District Engineer

States Forces and W. P. A. are widening roadway and structures from Clifton to Metcalf on Clifton-Springerville Highway. A. F. E. 3701. Raymond Gardner, resident engineer.

State Forces are grading, draining and surfacing 2 miles of roadway, beginning at 4-Bar Mesa extending south on the Coronado Trail. Clifton-Springerville Highway, A. F. E. 8127. W. B. Matlock, Construction Superintendent.

Geo. W. Orr has contract 44% complete to grade and drain 9½ miles of roadway beginning 2 miles east of Solomonville and extending southeasterly. Safford-State Line Highway, F. A. 88-A, 2nd Reo (1937) and Solomonville-Duncan Highway, F. A. 77, 2nd Reo, Schedule 1 (1937). A. J. Kerr, Resident Engineer.

Lee Moor has contract 40% complete for placing select material, aggregate base course and cut back road mix on approximately 2¾ miles of the Globe-Springerville Highway, F. A. 99-B 1st Reo. R. D. Canfield, Resident Engineer.

Daley Corporation has contract 35% complete for the widening of approximately 5.7 miles of the Phoenix-Globe Highway F. A. 33, 2nd Reo, and 48-A Reo.

N. G. Hill has contract 6% complete for the subgrading and aggregate base course and asphaltic surface treatment of approximately 20¼ miles of the Globe-Showlow Highway, F. A. 105 I to G. A. F. Rath, Resident Engineer.

H. R. Meadows has been awarded a contract for the construction of an addition to the present general office building of the Arizona Highway Department. William Wiley, Resident Engineer.

DISTRICT NO. 4
William R. Hutchins, District Engineer

State Forces have work 50% complete on grading and draining 7 miles of roadway on Nogales-Patagonia Highway. A. F. E. 8214. R. C. Bond, Resident Engineer.

State Forces and W. P. A. are widening roadway and structures on Bisbee-Douglas Highway A. F. E. 4401. Boone Waughtal, Engineer in Charge.

State Forces and W. P. A. are 44% complete constructing curbs, gutters and pavement in the City of Nogales. Nogales-Patagonia Highway, A. F. E. 4501. R. C. Bond, Resident Engineer.

Packard Contracting Company has contract 80% complete on 5.5 miles of roadway beginning at Tombstone and extending southeasterly. Benson-Douglas Highway, F. A. 79-C, 1st Reo (1937). A. J. Gilbert, Resident Engineer.

State Forces have Roadside Improvement work 75% complete between Picacho and Red Rock on the Florence-Tucson Highway, F. A. 94-D. R. I. Mark H. Layn, Resident Engineer.

State Forces and W. P. A. are widening roadway between Casa Grande and Picacho on the Casa Grande-Picacho Highway, A. F. E. 2701. Mark H. Layn, Resident Engineer.

Tiffany Construction Company has contract 80% complete for the construction of an overpass between Florence on the Tucson-Florence Highway, W. P. G. H. 94-B. Gene Gilpin, Resident Engineer.

State Forces and W. P. A. are widening roadway and doing Roadside Improvement work between Chandler and Sacaton on the Chandler-Picacho Highway, A. F. E. 25. Alfred R. Wilson, Foreman.

The Commission meeting was declared adjourned by Chairman Dowell at 4:00 P. M., October 26, 1937, to meet again subject to call. the final day's ceremonies. Pictures are not permitted to be taken during the ceremonies.

“On Easter Sunday the drum sounds before sunrise and the Indians gather for the recitation of the Litany of the Saints in the ramada and in the plaza, but aside from the occasional dances of the Pascoleros, (masked dancers, stripped to the waist, shell and gourd ornaments fastened to their legs) it is quiet in the plaza until about ten o'clock.

After the faithful assemble in the ramada the women who have acted as bearers in the Via Crucis procession again appear wearing the white veils and gilt crowns. They lift the platform with its statue to their shoulders and, preceded by two of the girls dressed as virgins, they will run from the ramada to the station at the other end of the lane of green boughs. This scene is to commemorate the visit of the three Marys to the tomb. Upon their arrival the dancers greet them with shouts, the music begins and the Pascoleros and the Matachinos commence their dances of joy. The women circle around the station and at once return to the ramada running as before. This is repeated twice and on the last return the Gloria is sung by the choristers. The procession forms and joined now by the Matachinos all circle about the plaza, pausing at the station and also at the smaller ramada where the crucifix was placed the day before. Green leaves and flowers again are showered on the statue and the dancers, more cohetes are fired and the men shout and dance even more madly than on Saturday morning. The harp and the violin, the guitar and the flute add their noise to those of the drum and the rattle then the little statue is borne to the rejoicing that fills the air. Three times the procession winds about the plaza and then the little statue is borne to the ramada for the last time where it is placed on the flower decorated table beside the lighted candles.

After the sermon which ends the services the people gather about the dancers who now vie with one another in the intricacy and the daring of their steps, in abandon of their gestures but always moving rythmically as if swayed by some power beyond their control. By noon the dancers have tired, anklets are unwound, belts untied and both hung from hooks in the ceiling of the hut or safely stowed away with the other belongings of the visitor.”

As the Yaqui Indians (the race is often called the “People without a Country” because they were banned from Mexico and are not citizens of the United States) have their ceremonies, so too, do the Papago Indians of the reservation west of Tucson. Here, during the winter months, the Papago tribesmen, who for the most part are cattlemen and ranchers, gather in informal rodeos in preparation for an elimination of contestants for the Indian Day contests of La Fiesta de los Vaqueros. Indian Day at the mid-winter rodeo is fast becoming one of the most colorful events in the Southwest. First of the all-Indian rodeos was held in October. Others will be held monthly until February, when the Indians converge on Tucson for the show.

It has been said that the Indian, the Mexican, and the cattleman and cowboy are the most romantic figures in southwestern history. Even today, as in history, these people are predominant in the active life of Tucson and the “big little community” of the Old Pueblo. since 1908, when it was created a National Monument.

Graham Mountain

Monument to Christendom

Tumacacori National Monument is a point of interest-intriguing moment, located just east of U. S. Highway 89, about 49 miles south of Tucson and 18 miles north of Nogales. The monument is under the supervision of the National Park Service. Rangers on duty are eager to point out and describe the many interesting features and details. No admission charge.

THE HARRIET F. COBB RELIEF MAP of the State of ARIZONA

Scale:Compiled, Published and Sold by ARIZONA MAPPING SERVICE 903 N. 1st. St. Phoenix Arizona Phone 42474 Drawn by Harriet F. Cobb Copyright 1937-P.T.Reeve,-Phoenix, Ariz. ALL RIGHTS RESERVED