Curing Concrete By Hunt Process

U S. ROUTE 70-109 Miles-Holbrook to State Line
STATE ROUTE 79-91 Miles-Prescott to Flagstaff
STATE ROUTE 83-83 Miles-Apache Junction to Globe
STATE ROUTE 81-128 Miles-Douglas to Safford
STATE ROUTE 74-121 Miles-Wickenburg to Ehrenberg
STATE ROUTE 73-104 Miles-Cutter to McNary
STATE ROUTE 187-13 Miles Sacaton Dam to Casa Grande
STATE ROUTE 71-26 Miles-Solomonville to Clifton
STATE ROUTE 83-28 Miles-Vail to Sonoita
STATE ROUTE 82-70 Miles-Nogales to Tombstone Junction
STATE ROUTE 84-66 Miles-Tucson to Casa Grande
STATE ROUTE 87-60 Miles-Mesa to Picacho
The Engineer's Log PAVING
Geo. B. Shaffer, Paving Engineer V. R. Dennie, contractor for the Prescott-Granite Dells Paving, F. A. Projects 19-B Reo. and 36-A, had the total project 93% complete Oct. 27, A. W. Newhall, Res. Eng.
CONSTRUCTIONSOUTHERN DISTRICT
T. S. O'Connell, Construction Engineer Ken Hodgman, Contractor on F. A. Project No. 31 Reo. (Repairing the Wickenburg Bridge) have the job 98% complete. The bridge is open to traffic. A. W. Newhall, Res. Engr.
S. Y. Faucette, contractor on F. A. Project No. 14 Reo., Schedule No. 2, Douglas-Rodeo highway, had the job 47% complete Oct. 27, W. J. Tavernor, Res. Engr.
O. C. McElrath, contractor on the two overhead crossings over the S. P. R. R. near Wellton, have F. A. No. 82-0 completed and 55 Reo. 80% complete Oct. 27, A. F. Rath, Res. Engr.
Chas. and F. W. Steffgen, contractors on F. A. No. 79-D Schedule No. 1, 22% complete, and Schedule No. 2, 24% complete Oct. 27, C. E. LeBart. Res. Engr.
Levy Construction Co., contractors on F. A. Project No. 84-C, Phoenix-Prescott Highway west of Wickenburg, had the project 58% complete Oct. 27, A. W. Newhall, Res. Engr.
Ware Co. contractors on Fairbanks Bridge, a Non F. A. Project on State Route No. 82, had the project 42% complete Oct. 27, C. E. LeBart, Res. Engr.
The Levy Construction Co. has resumed work on the Dome Bridge after discontinuing work in July on account of hot weather; on Oct. 27 they had the total project 31% complete, A. F. Rath, Res. Engr.
S. Y. Faucette, contractor on the Ehrinburg-Wickenburg project had the project approximately 5% complete Oct. 27, Julius Irion, Res. Engineer.
Canion & Francis, contractors on the San Tan section of the Chandler-Casa Grande highway, had the project approximately 15% complete Oct. 27, J. R. Van Horn, Res. Engr.
CONSTRUCTION NORTHERN DISTRICT
W. R. Hutchins, Const, Engr.
John Mulligan, contractor on schedule No. 3, F. A. Project No. 87-B GlobeSafford Highway, had the project 73% complete October 27th, Percy Jones, Res. Engr.
Lee Moore Construction Co., contractors on Schedule No. 5, F. A. No. 87-В, Globe-Safford Highway, had the project 39% complete Oct. 27th. Percy Jones, Res. Engr.
Orr, Rawls & Wright, contractors on Schedule No. 2, F. A. No. 87-B, GlobeSafford highway, had the project 65% complete Oct. 27th, V. C. Shrigley, Res. Engr.
Ken Hodgman, contractor on the Cooley-White River job, had the project approximately 25% complete Oct. 27th, Don Reed, Res. Engr.
The forces of the Kansas City Structural Steel Co. (contractors on the Grand Canyon Bridge) are putting forms in place for the concrete deck, total project 92% complete.
Lee Moore Construction Co., contractors on F. A. Project 87-C, Globe-Safford highway, had the project 23% complete Oct. 27th, Floyd J. Beeghly, Res. Engr.
Whiting Bros., Tanner & Packard, contractors on F. A. 89-B, AshforkFlagstaff highway, had the project 80% complete Oct. 27th, J. W. Macfarlane, Res. Engr.
ROAD BULLETIN
(Continued from page 21) Nogales to Tombstone 75 miles. Nogales to Patagonio 23 miles, gravel surfaced. To Sonoita, 12 miles, gravel surfaced. Fairbanks 31 miles. To Tombstone Junction 4 miles, U.S. 80, excellent highway. Fairbanks bridge closed for repairs. Detour at Tombstone via Charleston.
VAIL JUNCTION TO SONOITA, 28 MILES. Gravel surfaced, excellent.
CORONADO TRAIL, S. 71. Solomonville to Clifton, 26 miles, gravel surfaced, very good. Clifton to Springerville 126 miles, narrow mountain road, sharp curves and steep grades, very scenic highway.
BENSON-WILLCOX AND STEINS, 97 MILES. Cross tracks at depot, surfaced road 1.5 miles. Graded dirt road one mile to San Pedro river. Rough, partly graded road to top of Mesa, followed by 10 miles good road through Texas Canyon. To Dragoon 18 miles; Cochise 10 miles, Willcox 11 miles (4 miles rough, poor condition. Balance in good condition).
CASE GRANDE-GILA BEND, S. 84, 63 MILES. Partially improved, rough. Passable except in wet weather.
SOME INTERESTING ADS
"Bull dog for sale; will eat anything; very fond of children."
"A lady wants to sell her piano, as she is going abroad in a strong iron frame.
"Wanted: An airy bedroom for a gentleman twenty-two feet long and eleven feet wide."
Already a member? Login ».