This article outlines the status of various state highway construction projects across four districts in Arizona. The listed projects involve activities such as grading, draining, surfacing, and oil processing, with progress ranging from newly awarded contracts to completed works. Managed by designated district and resident engineers, some of these projects have been temporarily suspended due to weather conditions.

Featured in the January 1933 Issue of Arizona Highways

State Projects Under Construction In Arizona

DISTRICT NO. 1 Geo. B. Shaffer, District Engineer

L. E. Dixon has the oiling of approximately 24.38 miles of the Blythe-Wickenburg Highway, F. A. Projects 98 A and B., beginning at Wickenburg and extending west on U. S. Route 60, ten per cent complete. Jos. de Arozena, resident engineer.

The R. E. Hazard Construction Company has the grading, draining and oil surfacing on F. A. Project 72-B, Phoenix-Prescott highway, which begins at Congress Junction and extends to the top of Yarnell Hill approximately nine miles, four per cent complete. W. J. Jamieson, resident engineer.

Martin Brothers Trucking Co. has completed the grading, draining and placing of subgrade stabilizer on F. A. 84-B, Phoenix-Prescott Highway, (which begins at the Maricopa-Yavapai county line and extends approximately 12¼ miles towards Congress Junction.) Joe de Arozena, resident engineer.

Lee Moor has the oil processing on F. A. 98-H, U. S. 60, Blythe-Wickenburg highway (which begins at the Colorado river and extends east approximately five miles,) 85 per cent complete. H. D. Alexander, resident engineer.

N. G. Hill and Company has the grading, draining, surfacing and oil processing on F. A. 62-A and 62-B, Prescott Ashfork highway (which begins 4.3 miles south of Ashfork and extends south 19.4 miles,) 83 per cent complete. H. D. Alexander, resident engineer.

State forces have the widening and surfacing of the Gold Roads Hill on U. S. 66, 99 per cent complete. H. D. Alexander, resident engineer.

Jack Casson has the surfacing and oil processing on F. A. 98 E. and F., Blythe-Wickenburg highway, U. S. Route 60, (which begins near Salome and extends west approximately 21 miles) 74 per cent complete. A. W. Newhall, resident engineer.

Pearson and Dickerson have the oil processing on F. A. 80-A, Ashfork-Kingman highway, U.S. 66 (approximately 16 miles), near Peach Springs, 31 per cent complete. A. W. Newhall, resident engineer. Work on this project has been suspended on account of weather conditions.

F. N. Grant, District Engineer

Hodgman and MacVicar have the grading, draining and sub-grade stabilizing on F. A. 83-F, Holbrook-Lupton highway, (which begins at the city limits of Holbrook and extends easterly on U. S. 66, approximately 14 miles), 64 per cent complete, Floyd J. Beeghly, resident engineer.

Jack Casson has the grading, draining, sub-grade stabilizing and oil surfacing on F. A. 68-B, Springerville-St. Johns highway (which begins at Springerville and extends northeast approximately ten miles), 21 per cent complete. A. J. Gilbert, resident engineer.

The New Mexico Construction Co. has the oil processing on F. A. 89-D and E., Ash Fork-Flagstaff highway, (which begins about one mile east of Williams and extends approximately 17 miles towards Flagstaff) 21 per cent complete. M. Kisselberg, resident engineer. Work on this project has been suspended on account of weather conditions.

Hodgman and MacVicar have completed the grading, draining and placing of sub-grade stabilizer on F. A. 24 Reo., Unit "B", which begins at Flagstaff and extends approximately 6.5 miles west. James A. Parker, resident engineer.

R. C. Perkins, District Engineer

L. E. Dixon has the grading, and draining on F. A. Project 99-D on the Globe-Showlow Highway (which begins at Seven Mile Draw, about 19 miles northeast of Globe and extends northeasterly approximately 11¼ miles) four per cent complete. A. F. Rath, resident engineer.

L. E. Dixon has the grading and draining on F. A. 99-C, Globe-Showlow Highway, (which begins about 11¼ miles N. E. of Globe and extends northeasterly for a distance of approximately 11¼ miles) 80 per cent complete. F. C. Brannen, resident engineer.

W. R. Hutchins, District Engineer

Heafey-Moore and Jack Casson have started the surfacing and oiling on F. L. H.P. E-3 A., Casa Grande-Gila Bend Highway, (which begins about one mile east of Gila Bend and extends easterly to the Maricopa-Pinal line). George Lang, resident engineer.

Ralph Pleasant has started the surfacing and oiling on F. A. E-94-B, Florence-Tucson Highway, which begins at the town of Florence and extends west to Coolidge. M. D. Glessner, resident engineer.

Phoenix-Tempe Stone Co., has the grading, draining, surfacing and oiling on F. A. Project E-79-E, Benson Douglas Highway, (which begins one mile east of St. David and extends southeasterly approximately 7.4 miles) one per cent complete. C. S. Benson, resident engineer.

Orr and Rawls have the grading draining and placing of subgrade stabilizer on F. A. 79-F, Benson Douglas Highway, which begins at Tombstone and extends southeasterly approximately 8.9 miles) 93 per cent complete. R. D. Canfield, resident engineer.

Packard and Tanner have the grading, draining and placing of sub-grade stabilizer on F. A. 97-A, Mesa-Casa Grande Ruins Highway (which begins four miles south of Chandler and extends north-easterly) 94 per cent complete. H. B. Wright, resident engineer.

Skeels and Graham have the placing of subgrade stabilizer and oil processing on F. A. 25-A, 75, 86-B and 86-G, Tucson-Nogales Highway, (which begins about 22½ miles south of Tucson and extends south about ten miles) 81 per cent complete. J. R. Van Horn, resident engineer.

Ralph Pleasant has completed the oil processing on F. A. 79-G, Benson-Douglas Highway, (which begins about 18 miles south of Tombstone and extends south-easterly approximately six miles)., C. S. Benson, resident engineer.

State forces have the construction of a concrete bridge, a non-Federal Aid project approximately 6½ miles northwest of Bisbee on U. S. 80, Benson-Douglas Highway, 99 per cent complete. C. S. Benson, resident engineer.

Ralph Pleasant has been awarded a contract for grading, draining, placing of subgrade stabilizer and oil processing on E. 18-D, and E, Benson-Vail Highway, (which begins at the Pima-Cochise county line and extends easterly about 9 1/3 miles to the city limits of Benson. C. S. Benson, resident engineer.

R. H. Martin has been awarded the contract for the grading, draining and placing of subgrade stabilizer on F. A. Project E-18-B Benson-Vail Highway, (which begins at the north end of the Cienega Creek bridge and extends easterly about 6.35 miles). J. R. Van Horn, resident engineer.

Packard and Tanner have been awarded a contract for the grading, draining and placing of subgrade stabilizer on F. A. Project E-18-C, Benson-Vail Highway, (which begins about 5 3/4 miles west of the Pima-Cochise county line and extends easterly to the county line.) J. R. Van Horn, resident engineer.